• DE | EN
Menu
Short Title: Berufskolleg Detmold
Running Time: 07/2013 bis 11/2019
Topics: Refurbishment of individual buildings, Heating, ventilation and cooling, Daylight & lighting, New materials and components, Heating & cooling networks, Solar power
Innovation: Prefabricated modules in wood panel construction for facade insulation based on 3D scans
Keywords:

Quintessence

  • Plus energy target achieved
  • Facade insulation with wood panel elements
  • New passive house windows with particularly narrow profiles retain a high proportion of glazing
  • PV modules serve as roof cladding
  • Maintain heating via district heating from biomass
  • Refurbishment during operation

On the campus of the vocational college in Detmold, three school buildings and a sports hall were completely refurbished. The facades and top floor slabs were insulated with cellulose, passive house windows were installed and the roof surfaces were covered with PV panels. The existing heating system will continue to be used at lower temperatures. Combined with solar power generation and the use of district heating from biomass, the buildings are now reaching plus energy levels.

Project context

The district parliament in Lippe decided in 2008 to refurbish its own properties with passive house components and to use roof areas for solar power generation. When buildings of the Felix-Fechenbach-Berufskolleg from the years 1954 to 1962 were due for refurbishment, a plus energy school was designed from them. In the annual balance, therefore, more primary energy was to be generated than heating, ventilation and drinking water heating - including auxiliary energy - and lighting consumed.

In the run-up to the refurbishment, various extensions were added to the existing building.

Site plan of the Detmold Vocational Collage campus. Buildings 1-3 and the sports hall are being renovated to an energy-plus level.

© pape oder semke Architekturbüro, Detmold

The new rest zone with outside view

© pape oder semke Architekturbüro, Detmold

Once again the restroom with outside view from a different angle

© pape oder semke Architekturbüro, Detmold

Further images

View of the so-called “Learnscape”

© pape oder semke Architekturbüro, Detmold

View of the unrenovated building complex with the connecting pavilion between Buildings 1 and 2. It was significantly extended during the course of the renovation and now houses the so-called “Learnscape”, see Fig. 13.

© Fraunhofer IBP, Stuttgart

Research focus

In the project, special attention was paid to preserving existing structures and using materials that conserve resources. On the basis of life cycle considerations, prefabricated modules in wood panel construction filled with cellulose were chosen for the facade insulation.

The project is accompanied by social science. Pupils and teachers are regularly interviewed in order to record and evaluate the feeling of comfort before and after the refurbishment.

Concept

Refurbishment concept

The building materials used are characterised by the economical use of materials and resources during manufacture. The exterior walls were given a prefabricated curtain wall facade in timber construction with thermal bridge-optimised timber web girders. The construction is filled with 36 cm thick cellulose insulation. The facade elements were developed and produced with the help of a 3D scan of the buildings. In this way, dimensional tolerances of the uneven, inclined and strongly structured existing walls could be taken into account. Prefabrication made it possible to limit the insulation measures to the summer holidays.

Because newly developed passive house windows with particularly narrow profiles were installed, the effective glazing component of the facade remains high. The daylight situation is improved by inserting glazed skylights, bright coatings with a high degree of reflection, narrow and deep window frames and by avoiding deep window reveals.

On the flat sloping roofs, photovoltaic modules take over the function of the roof cladding. For good rear ventilation, the modules were mounted with an enlarged air gap on the sub-roof made of soft wood fibre, which supports their cooling via natural air convection.

Mounting the prefabricated facade elements on the old external elevations

© pape oder semke Architekturbüro, Detmold

Here the new facade, which consists of applied cladding made of timber panel elements, is being given a render coating.

© pape oder semke Architekturbüro, Detmold

Further images

Floor plan for Building 3 (ground floor)

© pape oder semke Architekturbüro, Detmold

View of Building 3 from the northwest

© pape oder semke Architekturbüro, Detmold

The gym after refurbishment

© pape oder semke Architekturbüro, Detmold

A component of the renovation concept are new, frontal facades with very good thermal insulation.

© pape oder semke Architekturbüro, Detmold

The new facade after completion, still with scaffold

© pape oder semke Architekturbüro, Detmold

Energy concept

In addition to the possibility of opening the windows, the classrooms are mechanically ventilated via decentralised devices with heat recovery. Two rooms are additionally equipped with ceiling fans for test purposes. For the most part, fluorescent lamps controlled by presence and daylight were already installed for the lighting; LED technology is now installed in the remaining areas.

The buildings will continue to be supplied with district heating from biomass - good for the primary energy balance. As part of the civil engineering work, the supply lines were also renewed and insulated. The significantly better building insulation made it possible to lower the flow temperatures and adjust the running times. In order to reduce losses in the circulation pipes, the hot drinking water supply was renewed.

The photovoltaic system with a total peak output of 346 kilowatts is of central importance for achieving an energy surplus.

A classroom. In the picture the deep window flanning because of the prefixed facade and the suspended presence and daylight-controlled lighting. Here additional with ceiling fan in order to analyse, how they influence the comfort.

© Hochschule Ostwestfalen-Lippe

Further images

Summary of the installed components

© BINE Informationsdienst

Heating diagram

© Fraunhofer IBP, Stuttgart

A weather station on the roof of the school provides location-base weather data for the factory master control system.

© Hochschule Ostwestfalen-Lippe

Performance

As the monitoring of the Ostwestfalen-Lippe University of Applied Sciences shows, the school has met the target of the primary energy plus energy balance since its completion in 2016. The refurbishment reduced the final energy consumption for heat by approx. 65%. The provision of hot drinking water consumes about twice as much energy after the refurbishment as predicted. Despite subsequently insulated pipes and the reduction of consumption points to a few rooms, pipe and storage losses account for more than 90%. Scientists are currently investigating the causes and possibilities for optimisation.

Consumption and loads are recorded individually in two classrooms: The whiteboard including the teacher's PC consumes the largest amount of electricity (approx. 4.3 kWh/(m²a)), a system with which the school was already equipped before the refurbishment.

The energy consumption of the static heating in the classroom is approx. 24 kWh/(m²a) and could be reduced by more than 80% compared to the initial state. However, this did not only result in the refurbishment, but also in a further 21% reduction in consumption after the first year of operation.

Annual balance of the final energy in the comparison to the stock and the demand forecast (related to the reference climate Potsdam); for the stock no measurement data of the electricity consumption were available. Due to the primary energy factor 0 of the district heating, the largely self-used solar power and the refurbishment of the building shell, the plus energy level is reached.

© iFE Institut für Energieforschung

Individual consumption in the classrooms. The listed final energy consumption for heat was site and climate adjusted.

© iFE Institut für Energieforschung

Evaluation of ventilation

Staff at the Institute for Resource Efficiency and Energy Strategies (IREES) regularly interview students and teachers to assess their sense of comfort before and after refurbishment. According to this, the users were particularly dissatisfied with the air quality after the refurbishment, although a CO2 concentration below 1,000 ppm was measured during the predominant period of use. Measurements showed critical conditions of air humidity in winter: The fresh air volume flow of approx. 20 m³/h per person led to a relative humidity of only 20 to 30% during about one third of the usage period in winter - a typical problem with mechanical ventilation. After adjusting the heating control and lowering the maximum volume flow to 12 m³/h, the limit value of 40% was fallen short of much less frequently. The scientists are currently investigating how it is possible to guarantee sufficient relative humidity at a low CO2 concentration in the long term.

Optimisation

The existing heating circuits of the old buildings can only be regulated building specifically without additional effort, as the distribution is designed as a Tichelmann system. Both the classrooms in the basement and the computer rooms, standard classrooms and teachers' rooms are assigned to the same heating circuit. The possibility of adjusting temperatures in the rooms is limited to the individual setting of the existing (authority) thermostatic valves and the operating time of the heating system.

The intensive monitoring in combination with room simulations enabled a step-by-step approach to an optimal operating mode of the heating system through adjustments during operation.

Economic efficiency

The minimal change in the existing situation, the refurbishment during ongoing operation and the use of the existing heating and distribution system significantly reduce costs compared to a new building or refurbishment with a new supply concept. The use of the school during the day also favours a high degree of self-utilisation of the solar power generated on site.

The consumption costs for heat in 2017 were 48% lower than before the refurbishment. If the remuneration for PV feed-in is included, the costs are reduced by 55%. Further savings are expected with the adjustment of the heating control system.

Award

The refurbishment concept was awarded the BMWi "School 2030" prize and received a special prize for its innovative lighting concept.

The jury honoured the success in giving the buildings of the 1950s a contemporary face in connection with the ambitious energy-efficient refurbishment. It was positively rated that the constructive solution of thermal insulation in the window area did not result in any loss of glass surfaces.

Project data

Building data

Who is who?  
Building owner Kreis Lippe, Der Landrat, Eigenbetrieb Schulen
   
Building type Vocational college
   
Year of construction 1957
Completion 2015
Commissioning process 2015
   
Measures  
Heated net floor area (for non-residential buildings, based on DIN 277) 8.039 m²
Gross volume 19.638 m³
Jobs (or pupils or comparable personal details) 875 Personen
A/V ratio (possibly before / after refurbishment) 0,67 m²/m³

Energy data

Energy characteristics Demand        
after the refurbishment before  
Heat demand (useful energy demand heat) 13,30 203,79 kWh/m²a  
Primary energy heat 11,00 161,10 kWh/m²a  
Primary energy total 91,71 217,13 kWh/m²a  

Financial ratios

refurbishment costs    
Costs for the refurbishment of the building construction [KG 300] 591 EUR/m²
Costs for the refurbishment of technical installations [KG 400] 131 EUR/m²